Concrete Formwork Form Tie System Used in Southeast Aisa

Aug. 24, 2021

Our company Hebei Trico supplies a variety of formwork system accessories and scaffolding system fittings. Formwork tie rod system, form tie system, aluminum formwork system, steel plywood formimg system, forming wall ties, various formwork clamps, steel props, ringlock scaffolding system, plastic spacers, plastic formwork, and the related accessories are all available. Here is the introduction of Form Tie System mainly used in Southeast Asia. 

Form Tie System is designed to protect breakage of formwork, to maintain accurate form spacing and to ensure the dimensional accuracy of the conceret structure. It is widely used in the construction industry. Besides the ease of assemly and removal, the for tie system saves construction costs as all parts are reusable except for the separator(Inner Unit) which is casted into the wall. There are 4 types of Form Tie System:B Type,C Type, BC Type and D Type. 

Form Tie Complets Set Requirements:

The Form Tie System B Type consists of B Form Tie 2pcs, B Inner Unit 1pc, Plastic B Cone 2pcs, Rib Washers 2pcs and Hex Nut 2pcs. 

Concrete Formwork Form Tie System Used in Southeast Aisa

The Form Tie System D Type consists of  D Form Tie 2pcs, D Inner Unit 1pc, Plastic D Cone 2pcs, Rib washers 2pcs and Hex Nut 2pcs. 

Concrete Formwork Form Tie System Used in Southeast Aisa

How to order

For Form Tie B and D: Please mention size of Form Tie which is the thickness of wale and stud pus 2 inches.

                                     Specify W5/16 or W3/8 in accordance with inner unit dia.(Ex. Form Tie 250mm, W3/8)

For Inner Unit: Please specify B, C,BC or D and wall thickness(Ex. Inner Unit D 250mm(wall thickness))

For Plastic B Cone: Please specify concrete panel thickness and inner unit diameter.